Zareba Home Page
Automatic Gate Openers
Home
Installation
  
  
  
     
  INSTALLATION
     
  
  
  
  
  
  

 
 

This page contains information you need to successfully install your Zareba Automatic Gate Opener, including how-to videos and manuals. Click the links to navigate directly to the product section.

Pre-Installation Guide and Preparation

G550 Installation Manual and Video

G552 Installation Manual and Video

G750 Installation Manual and Video

G752 Installation Manual and Video

Gate Opener Accessory Manuals

Pre-Installation and Preparation

Automatic Gate Opener Pre-Installation Guide English (PDF)  


Before You Begin
Advanced preparation will help assure the Zareba Automatic Gate Opener installs successfully. Before you start:

1) thoroughly review the Installation Manual included with your Gate Opener kit
2) have two people on hand for the installation
3) allow 3-4 hours to complete all steps

 

Gate Preparation
For the Zareba Automatic Gate Opener to operate smoothly, the gate it is attached to must be in good working condition and MUST meet the following requirements:

  • Gate needs to be plumb, level and swing freely on its hinges
  • Wheels can not be attached to the gate
  • Gate can move through its arc without binding or dragging on the ground
  • Ball-bearing hinges with grease fittings are used with gates weighing over 250-pounds
  • Fence post is secured in the ground with concrete to minimize flex or twist
  • Gate has a horizontal cross member to provide stability

Tools required
Have the following tools on hand before you begin installation.

  • Power drill with 3/8" drill bit
  • Open-end wrenches - 3/8", 7/16", 1/2" and 9/16"
  • Hacksaw or heavy-duty bolt cutters
  • Small (flat-bladed) screwdriver
  • Phillips screwdriver
  • Tape measure
  • Level
  • Wire strippers (for stripping transformer cable)
  • Two c-clamps

You Will Also Need
You will need the appropriate length of low voltage wire to run in one continuous length from your gate opener control box to where the transformer will be plugged into AC power. DO NOT splice this wire as voltage loss and corrosion will occur to spliced, buried wire.

This low-voltage wire must be 16-gauge, multi-stranded, dual-conductor wire. It is available from Zareba Systems (part number GW1) Customer Service or in the electrical department of most hardware stores.

Note that voltage degradation occurs the further your gate is from the AC power source. You will need to use solar panels to charge your battery if greater than 1,000-feet from an AC power source.

Situation Specific Parts
Threaded rods or carriage bolts longer than 8" - if your fence post is more than 6" in diameter the bolts in the Gate Opener kit will not be long enough

Reinforcement supplies - a thin-walled tube or panel gate may require a wood or metal reinforcement plate or pipes to adequately attach the opener arm to the gate

Horizontal cross member or mounting plate - may be needed on some types of gates for mounting the front of the opener and gate bracket to the gate.

PVC conduit for burying low voltage wire per applicable local electrical codes.

G550 Single Gate Opener Installation Manual and Video

G550 Single Automatic Gate Opener Manual English (PDF) Spanish (PDF)



G552 Double Gate Opener Installation Manual and Video

G552 Double Automatic Gate Opener Manual English (PDF) Spanish (PDF)



G750 Single Gate Opener Installation Manual and Video

G750 Single Automatic Gate Opener Manual English (PDF) Spanish (PDF)



G752 Double Gate Opener Installation Manual and Video

G752 Double Automatic Gate Opener Manual English (PDF) Spanish (PDF)



Zareba Automatic Gate Opener Accessory Manuals

GB1 Push Button Installation Manual English (PDF) Spanish (PDF)
GL1 Gate Lock Installation Manual English (PDF) Spanish (PDF)
GS1 Ground Sensor Installation Manual English (PDF) Spanish (PDF)
GSP5 / GSP10 / GSP20 Solar Panel Manual English (PDF) Spanish (PDF)

 

http://www.zarebasystems.com
Copyright © 2010 Zareba Systems. All rights reserved.